Project Description
PORTFOLIO SHOWCASE
Dry Cleaning Facility

Project Detail
5,500 SF commercial facility build-to-suit
To reduce/maintain operation time while effectively lowering overhead cost via automated system
Provided architectural, engineering, permitting, layout and equipment solution service
Upgraded & start-new all site utilities (water, gas and electrical)
Sorting system with continuous speed rack installation
New flooring, boiler room and 700 SF office space.
Alternative dry cleaning machine (4) rigging, installation and final connection
Cement foundation service
Provided utility connections including gas, steam, compressed air and water
Full Y.A.C laundry shirt equipment rigging and installation
Complete line of press machine and washer & dryer provided and installed
Three 25-hp boiler rigging, installation and final connection